Case Study: Wright Elementary School, Merced, CA
Client: Wright Elementary School, Merced, CA
Project: Playground Installation
Completion Date: September 28, 2023
Background
Wright Elementary School sought to modernize its playground facilities to provide students with a safer, more engaging, and accessible play environment. The school prioritized inclusive design and durable equipment that could accommodate daily use by large student groups.
Challenges
Upgrading aging playground infrastructure
Ensuring ADA compliance for inclusive access
Completing the project within a busy back-to-school season
Staying aligned with the school district’s safety and quality standards
Solution
Harmonson Construction provided:
New Playground Systems – Installed equipment designed for safety, creativity, and student interaction
Accessibility Enhancements – ADA-compliant surfaces and equipment to ensure inclusive play
Efficient Project Coordination – Completed construction during a high-traffic school period with minimal disruption
On-Time Delivery – Project completed before October as scheduled, aligning with district expectations
Results
Modernized Play Area – A vibrant, student-friendly space encouraging movement and outdoor engagement
Accessible to All Students – Inclusive design allows children of all abilities to participate
High-Quality Construction – Long-lasting materials ensure durability with low maintenance requirements
Conclusion
Harmonson Construction successfully transformed Wright Elementary School’s playground into a dynamic, inclusive space that supports physical activity and imaginative play. The project met all goals on schedule and within scope, reinforcing the school’s commitment to student well-being.






